Serving commercial aquatic facilities across New York State.

Talk With Angelo

Markets served

Architects, Engineers & Aquatic Consultants

Design teams need a local source who knows the equipment, knows New York's approval process, and will still be there for commissioning. FreyTech has supported architects, engineers, and pool consultants on New York projects for decades and can help you specify controls and chemical feed that the owner's staff can actually operate.

Operational pressures

What makes chemistry hard here

  • Basis-of-design decisions made early with incomplete information about owner operations.
  • Coordination between pool consultant, MEP engineer, and controls scope.
  • Substitution requests during bidding that need technical review.
  • Health department plan approval timelines (10 NYCRR 6-1.8) that affect the schedule.
  • Commissioning and owner training that fall through the cracks at closeout.

Buying triggers

When projects usually start

  • Schematic design of a new natatorium or aquatic center
  • Renovation study of an existing pool mechanical room
  • Substitution or approved-equal request on a bid
  • Owner request for remote monitoring or BMS integration
  • Closeout requirements for commissioning and training

Relevant solutions

What typically fits

Recommendations are made after an assessment. These are the solutions most often relevant to this market.

Engineering & Specification Support

Product selection, equipment schedules, submittal packages, sequence-of-operation language, and coordination with mechanical systems.

References in this market

Facilities FreyTech has served in this market.

  • Argus Engineering
  • Bearsch, Compeau, Knudson Architects
  • Bernier Carr Group
  • Cannon Architects
  • Fellenzer Engineers
  • Lan Associates
  • M&E Engineers
  • Sage Engineering
  • SEI Architects and Design
  • Towne Engineering
  • Counsilman-Hunsaker
  • Water Technology, Inc.

Before you contact us

Helpful to have ready

None of this is required. It lets a specialist prepare a useful first conversation.

  • Bodies of water, volumes, and turnover
  • Chemical program and storage constraints
  • Owner's operating and monitoring expectations
  • Project stage and submission deadlines
  • Existing equipment (for renovations)

Next step

Request Specification Assistance

Send the project basics and we will respond with selection guidance, schedules, or submittal support for your deadline.

Architects & Engineers: frequently asked questions

Will you provide manufacturer submittal documents?

Yes, for projects where FreyTech is the supplier or supporting the specification. Manufacturer documents are provided through us with the manufacturer's permission rather than published openly on this site.

Can you review an approved-equal request?

Yes. We compare the proposed substitute against the specified controller or feeder on capacity, measured points, safety functions, communications, serviceability, and local support, and document the differences for the engineer's decision.

Other markets: Schools & Universities · Municipal · YMCAs & JCCs · Competition Pools · Healthcare & Therapy · Hospitality · Camps & Seasonal · Waterparks

Next step

Request a commercial pool system assessment

Tell us about your facility, current controller, chemical feed, and timing. A commercial aquatic specialist will review it and follow up with next steps for your system.

Serving commercial aquatic facilities across New York State.